| MOQ: | 1 basket |
| Price: | $15.6- $189.2per basket |
| Standard Packaging: | plastic and wooden pallet |
| Delivery Period: | 14-20 days after get the deposite |
| Payment Method: | L/C, D/A, D/P, T/T, Western Union, MoneyGram,paypal |
| Supply Capacity: | 200 unit per week |
Galvanized Welded G0abion Box / Welded Gabion Basket / Wire Mesh Gabions
![]()
BM Metal Mesh provided Gabion baskets,some unique situations regarding land space, using recycled materials, etc. With the construction of an entirely new building, the old building was torn down creating “unusable” brick and concrete.
![]()
Gabions/Gabion Boxes Stone Cages exhibit a great deal of flexibility and therefore conform to irregular lines and grades. Constructing with gabions requires no specialized labor or equipment.
| Length | Width | Height | Diaphragm | Volume | Tolerance |
| 2.0m | 1.0m | 0.3m | 1 | 0.6m3 | |
| 3.0m | 1.0m | 0.3m | 2 | 0.9m3 | |
| 4.0m | 1.0m | 0.3m | 3 | 0.2m3 | |
| 2.0m | 1.0m | 0.5m | 1 | 1.0m3 | L+/-3% |
| 3.0m | 1.0m | 0.5m | 2 | 1.5m3 | W+/-5% |
| 4.0m | 1.0m | 0.5m | 3 | 2.0m3 | H+/-5% |
| 1.0m | 1.0m | 0.5m | 0 | 1.0m3 | |
| 1.0m | 1.0m | 1.0m | 0 | 1.5m3 | |
| 2.0m | 1.0m | 1.0m | 1 | 2.0m3 | |
| 3.0m | 1.0m | 1.0m | 2 | 3.0m3 | |
| 4.0m | 1.0m | 1.0m | 3 | 4.0m3 |
| MOQ: | 1 basket |
| Price: | $15.6- $189.2per basket |
| Standard Packaging: | plastic and wooden pallet |
| Delivery Period: | 14-20 days after get the deposite |
| Payment Method: | L/C, D/A, D/P, T/T, Western Union, MoneyGram,paypal |
| Supply Capacity: | 200 unit per week |
Galvanized Welded G0abion Box / Welded Gabion Basket / Wire Mesh Gabions
![]()
BM Metal Mesh provided Gabion baskets,some unique situations regarding land space, using recycled materials, etc. With the construction of an entirely new building, the old building was torn down creating “unusable” brick and concrete.
![]()
Gabions/Gabion Boxes Stone Cages exhibit a great deal of flexibility and therefore conform to irregular lines and grades. Constructing with gabions requires no specialized labor or equipment.
| Length | Width | Height | Diaphragm | Volume | Tolerance |
| 2.0m | 1.0m | 0.3m | 1 | 0.6m3 | |
| 3.0m | 1.0m | 0.3m | 2 | 0.9m3 | |
| 4.0m | 1.0m | 0.3m | 3 | 0.2m3 | |
| 2.0m | 1.0m | 0.5m | 1 | 1.0m3 | L+/-3% |
| 3.0m | 1.0m | 0.5m | 2 | 1.5m3 | W+/-5% |
| 4.0m | 1.0m | 0.5m | 3 | 2.0m3 | H+/-5% |
| 1.0m | 1.0m | 0.5m | 0 | 1.0m3 | |
| 1.0m | 1.0m | 1.0m | 0 | 1.5m3 | |
| 2.0m | 1.0m | 1.0m | 1 | 2.0m3 | |
| 3.0m | 1.0m | 1.0m | 2 | 3.0m3 | |
| 4.0m | 1.0m | 1.0m | 3 | 4.0m3 |